Installation of new Sewage Treatment Plant
AGH Contract Services secured the contract to install a new sewage treatment plant system for Bradeney House nursing & care home, located in Worfield, Bridgnorth.
The scope of work included:
- Excavate ground to reduce levels
- Lay strip foundations
- Excavate and install 2-stage Primary Settlement Tank
- Excavate and install Humus settlement tank
- Lay new foul drain to new package treatment plant
- Excavate drain trench for pipes
- Lay new surface water drains to new soakaways
- Build manholes - complete with covers
- Deposit excavated material on site
- Re-instate ground
- Arrange commission of plant, etc
<
>