Bradeney Care Home

Installation of new Sewage Treatment Plant

AGH Contract Services secured the contract to install a new sewage treatment plant system for Bradeney House nursing & care home, located in Worfield, Bridgnorth.

The scope of work included:

  • Excavate ground to reduce levels
  • Lay strip foundations
  • Excavate and install 2-stage Primary Settlement Tank
  • Excavate and install Humus settlement tank
  • Lay new foul drain to new package treatment plant
  • Excavate drain trench for pipes
  • Lay new surface water drains to new soakaways
  • Build manholes - complete with covers
  • Deposit excavated material on site
  • Re-instate ground
  • Arrange commission of plant, etc